• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0514391
JurisdictionTampa City
Categorybuilding
Last CheckedMar 12, 2026
Status
Complete
Owner
Keith And Georgeann Ligori
Address
5920 PRINTERY ST 106, TAMPA, FL 33616
Zoning
COMMUNITY MIXED USE-35 (2.0 FAR)
Risk
AESFHABFE 9 ft
Advanced details
Owner
Keith And Georgeann Ligori
Parcel
1324273732
Value
$528,362.00
Year Built
2007
Stories:
3
Units:
1
Buildings:
0
Land Use Code:
0400
Zoning Acres:
147427.2752
FIRM Panel:
1201140037C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
007102
Population:
80

Preparing the map…

5920 PRINTERY ST 106, TAMPA, FL 33616

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 2 Applied, 1 Not Applicable, 4 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-02-25
Utilities - Certificate of Occupancy Hold for Water - Backflow Assembly Testing
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2025-02-25
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-02-26
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net regarding this hold. The scope of work involves minimal plumbing renovations, and water has determined that the existing meter is adequate for anticipated demand. Wastewater holds have been released
Informational • 2025-02-26
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-02-26

Related Records1

BLD-25-0514391
Complete
BLDLP-25-005641
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-25-005641 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 2 Applied, 1 Not Applicable, 4 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-02-25
Utilities - Certificate of Occupancy Hold for Water - Backflow Assembly Testing
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2025-02-25
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-02-26
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net regarding this hold. The scope of work involves minimal plumbing renovations, and water has determined that the existing meter is adequate for anticipated demand. Wastewater holds have been released
Informational • 2025-02-26
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-02-26

Related Records1

BLD-25-0514391
Complete
BLDLP-25-005641
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Mar 8, 20261 change
  • Status updated from Awaiting Client Reply to Complete
Get notified when this permit changes.
Add to Plotwise Watchlist →