• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0514392
JurisdictionTampa City
Categorybuilding
Last CheckedMar 12, 2026
Status
In Process
Job Value

$300,000.00

Owner
Ybor Marti Llc
Address
1714 E 4TH AVE, TAMPA, FL 33605
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Ybor Pedroso Llc
Parcel
1900760000
Value
$71,488.00
Acreage:
0.08
Land Use Code:
1000
Land Use Group:
VACANT COMM.
Zoning Acres:
147440.3701
FIRM Panel:
1201140024C
Flood Source:
12057C_STUDY5
Census Tract:
003900
Population:
14
Legal Description

Pons Map, W 1/2 Of Lot 9 Block 66

Preparing the map…

1714 E 4TH AVE, TAMPA, FL 33605

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Razed/Cleared
Building Condition Code: 07
Informational • 2015-01-11
Building - 9 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-02-25
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-02-25
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-02-25
Termite Certificate
Termite certification required prior to C/O
Informational • 2025-03-18

Related Records6

BLD-25-0514392
In Process
UTL-25-0000983
In Process
BLD-25-0516463
Revision
UTL-23-0001402
In Process
BLD-24-0508898
Pending
BDE-25-0444369
Complete
BLDLP-25-007976
Complete

Frequently Asked Questions

Related Links

Related Permits

  • UTL-25-0000983 (related)
  • BLD-25-0516463 (related)
  • UTL-23-0001402 (related)
  • BLD-24-0508898 (related)
  • BDE-25-0444369 (related)
  • BLDLP-25-007976 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Razed/Cleared
Building Condition Code: 07
Informational • 2015-01-11
Building - 9 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-02-25
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-02-25
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-02-25
Termite Certificate
Termite certification required prior to C/O
Informational • 2025-03-18

Related Records6

BLD-25-0514392
In Process
UTL-25-0000983
In Process
BLD-25-0516463
Revision
UTL-23-0001402
In Process
BLD-24-0508898
Pending
BDE-25-0444369
Complete
BLDLP-25-007976
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →