• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0514923
JurisdictionTampa City
Categorybuilding
Last CheckedMar 14, 2026
Status
Issued
Owner
Ag Ehc Ii Len Multi State 3 Llc
Address
1905 N OREGON AVE 1-24, TAMPA, FL 33607
Zoning
NEIGHBORHOOD MIXED USE - 35 (1.0 FAR NONRESIDENTIAL USES, 1.5 FAR VERTICAL MIXED-USE OR RESIDENTIAL ONLY)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Ag Ehc Ii Len Multi State 4 Llc
Parcel
1798220252
Value
$100.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
0903
Zoning Acres:
147427.2752
FIRM Panel:
1201140023C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004300
Population:
88

Preparing the map…

1905 N OREGON AVE 1-24, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-03-25
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-03
Termite Cert
Termite Certification Required
Informational • 2025-04-03
FEMA flood elevation certificate
FEMA flood elevation certificate required prior to C/O
Informational • 2025-04-24
Termite Certificate
Termite certification required prior to C/O
Informational • 2025-04-24

Related Records22

BLD-25-0514923
Issued
BLD-25-0514919
Issued
BLD-24-0511185
Pending
BLD-25-0514341
Closed
BLDLP-25-006876
Complete
BLD-25-0514210-REV1
Complete
BLD-24-0511704
Pending
BLD-24-0511186
Pending
UTL-25-0000483
Closed
BLDLP-23-009125
Complete
BLDLP-25-003503
Complete
BLD-25-0514210
Complete
BLD-25-0514340
Issued
BLD-25-0514063
Issued
BLDLP-25-006868
Complete
BLD-24-0507635
Pending
BLDLP-25-004957
Complete
BLD-24-0511244
Pending
SPR-25-0001366
Site Plan Review Complete
BLD-25-0514926
Issued
BLDLP-25-004870
Complete
BLD-25-0514342
Issued
BLDLP-24-003631
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-25-0514919 (related)
  • BLD-24-0511185 (related)
  • BLD-25-0514341 (related)
  • BLDLP-25-006876 (related)
  • BLD-25-0514210-REV1 (related)
  • BLD-24-0511704 (related)
  • BLD-24-0511186 (related)
  • UTL-25-0000483 (related)
  • BLDLP-23-009125 (related)
  • BLDLP-25-003503 (related)
  • BLD-25-0514210 (related)
  • BLD-25-0514340 (related)
  • BLD-25-0514063 (related)
  • BLDLP-25-006868 (related)
  • BLD-24-0507635 (related)
  • BLDLP-25-004957 (related)
  • BLD-24-0511244 (related)
  • SPR-25-0001366 (related)
  • BLD-25-0514926 (related)
  • BLDLP-25-004870 (related)
  • BLD-25-0514342 (related)
  • BLDLP-24-003631 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-03-25
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-03
Termite Cert
Termite Certification Required
Informational • 2025-04-03
FEMA flood elevation certificate
FEMA flood elevation certificate required prior to C/O
Informational • 2025-04-24
Termite Certificate
Termite certification required prior to C/O
Informational • 2025-04-24

Related Records22

BLD-25-0514923
Issued
BLD-25-0514919
Issued
BLD-24-0511185
Pending
BLD-25-0514341
Closed
BLDLP-25-006876
Complete
BLD-25-0514210-REV1
Complete
BLD-24-0511704
Pending
BLD-24-0511186
Pending
UTL-25-0000483
Closed
BLDLP-23-009125
Complete
BLDLP-25-003503
Complete
BLD-25-0514210
Complete
BLD-25-0514340
Issued
BLD-25-0514063
Issued
BLDLP-25-006868
Complete
BLD-24-0507635
Pending
BLDLP-25-004957
Complete
BLD-24-0511244
Pending
SPR-25-0001366
Site Plan Review Complete
BLD-25-0514926
Issued
BLDLP-25-004870
Complete
BLD-25-0514342
Issued
BLDLP-24-003631
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →