• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0515056
JurisdictionTampa City
CategoryBuilding
Last CheckedMar 16, 2026
Status
Complete
Description

Fema: Replace 3 outlets, replace 2 5 tons straight cool split system equal change out INTERIOR RENOVATIONS, PAINTING, CABINETS. ELETRICAL OUTLETS AND REPLACE ONE TOILET. AC UPGRADE, BLD-25-0514472

Job Value

$35,000.00

Owner
Bc Realty Llc
Address
4020 ADAMO DR, TAMPA, FL 33605
Zoning
HEAVY INDUSTRIAL (1.5 FAR)
Risk
AESFHABFE 10 ft
Advanced details
Owner
Bc Realty Llc
Parcel
1604330300
Value
$2,334,000.00
Year Built
1965
Stories:
1
Units:
0
Buildings:
1
Land Use Code:
4830
Zoning Acres:
147427.2752
FIRM Panel:
1201140025C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
003700
Population:
0

Preparing the map…

4020 ADAMO DR, TAMPA, FL 33605

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 3 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-01
Warning Notice
All construction work is required to cease until terms and conditions of order are satisfied. This job requires a Building alterations permit. BLD-Alterations record BLD-25-0515056 has been in “Awaiting Client Reply” status since 05/23. The required corrections must be made to that record and once issued with approved construction documents, the full scope of work associated with this Interior remodel/alteration must be inspected on this record. Individual BTR records are not appropriate nor valid for this scope of work
Informational • 2025-06-06
Utilities - Certificate of Occupancy Hold for Water - Cross Connection Inspection (Backflow)
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2025-07-31
Wastewater Commitment Required
no plumbing - wastewater commitment not required; A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-07-31
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-08-05

Related Records5

BLD-25-0515056
Complete
BLD-25-0515664
Complete
BTR-25-0608325
Complete
BLDCO-25-000472
Complete
BLDLP-25-008542
Complete
BLDLP-25-008543
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-25-0515664 (related)
  • BTR-25-0608325 (related)
  • BLDCO-25-000472 (related)
  • BLDLP-25-008542 (related)
  • BLDLP-25-008543 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 3 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-01
Warning Notice
All construction work is required to cease until terms and conditions of order are satisfied. This job requires a Building alterations permit. BLD-Alterations record BLD-25-0515056 has been in “Awaiting Client Reply” status since 05/23. The required corrections must be made to that record and once issued with approved construction documents, the full scope of work associated with this Interior remodel/alteration must be inspected on this record. Individual BTR records are not appropriate nor valid for this scope of work
Informational • 2025-06-06
Utilities - Certificate of Occupancy Hold for Water - Cross Connection Inspection (Backflow)
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2025-07-31
Wastewater Commitment Required
no plumbing - wastewater commitment not required; A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-07-31
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-08-05

Related Records5

BLD-25-0515056
Complete
BLD-25-0515664
Complete
BTR-25-0608325
Complete
BLDCO-25-000472
Complete
BLDLP-25-008542
Complete
BLDLP-25-008543
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →