• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0515077
JurisdictionTampa City
Categorybuilding
Last CheckedMar 18, 2026
Status
Issued
Owner
Spencer Lan Rozin And Honey Nora Rozin/trustees
Address
613 W NORTH BAY ST, TAMPA, FL 33603
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Spencer Lan Rozin And Honey Nora Rozin/trustees
Parcel
1665230064
Value
$340,736.00
Year Built
1944
Stories:
2
Units:
3
Buildings:
3
Land Use Code:
0100
Zoning Acres:
147427.2752
FIRM Panel:
1201140015C
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
002300
Population:
12

Preparing the map…

613 W NORTH BAY ST, TAMPA, FL 33603

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2024-12-09
Building - 3 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-02
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-02
Default - 1 Applied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-04-02

Related Records8

BLD-25-0515077
Issued
BLD-25-0515548
Expired
BLD-25-0515161
Expired
BLD-25-0514776
Complete
BLD-25-0514831
Complete
BLD-25-0515178
Complete
BLD-25-0514805
Revision
BLD-25-0515123
Complete
SPR-25-0000006
Site Plan Review Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-25-0515548 (related)
  • BLD-25-0515161 (related)
  • BLD-25-0514776 (related)
  • BLD-25-0514831 (related)
  • BLD-25-0515178 (related)
  • BLD-25-0514805 (related)
  • BLD-25-0515123 (related)
  • SPR-25-0000006 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2024-12-09
Building - 3 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-02
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-02
Default - 1 Applied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-04-02

Related Records8

BLD-25-0515077
Issued
BLD-25-0515548
Expired
BLD-25-0515161
Expired
BLD-25-0514776
Complete
BLD-25-0514831
Complete
BLD-25-0515178
Complete
BLD-25-0514805
Revision
BLD-25-0515123
Complete
SPR-25-0000006
Site Plan Review Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Feb 3, 20261 change
  • Status updated from In Process to Issued
Jan 16, 20261 change
  • Status updated from Awaiting Client Reply to In Process
Get notified when this permit changes.
Add to Plotwise Watchlist →