• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0515089
JurisdictionTampa City
Categorybuilding
Last CheckedMar 20, 2026
Status
Complete
Owner
Ryan And Keegan Tahiri
Address
405 S DELAWARE AVE, TAMPA, FL 33606
Risk
—
Advanced details
Owner
—
Parcel
—
Value
—

Preparing the map…

405 S DELAWARE AVE, TAMPA, FL 33606

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 4 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-03
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-03
Default - 1 Complied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-04-03
required mitigation
Install two 2.5" Caliper Type one trees and two 3" Caliper penalty trees and thirty-two 6' Clear Trunk Palm or pay into the applicable Tree Trust Fund for any trees not planted
Informational • 2025-04-15
Private Provider Final Inspection Report required
Private Provider Final Inspection Report required
Informational • 2025-04-15

Related Records5

BLD-25-0515089
Complete
SPR-25-0000528
Site Plan Review Complete
UTL-25-0000471
Closed
BLDLP-25-006310
Complete
BLDLP-25-008437
Complete
BLDLP-25-006702
Complete

Frequently Asked Questions

Related Links

Related Permits

  • SPR-25-0000528 (related)
  • UTL-25-0000471 (related)
  • BLDLP-25-006310 (related)
  • BLDLP-25-008437 (related)
  • BLDLP-25-006702 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 4 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-03
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-03
Default - 1 Complied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-04-03
required mitigation
Install two 2.5" Caliper Type one trees and two 3" Caliper penalty trees and thirty-two 6' Clear Trunk Palm or pay into the applicable Tree Trust Fund for any trees not planted
Informational • 2025-04-15
Private Provider Final Inspection Report required
Private Provider Final Inspection Report required
Informational • 2025-04-15

Related Records5

BLD-25-0515089
Complete
SPR-25-0000528
Site Plan Review Complete
UTL-25-0000471
Closed
BLDLP-25-006310
Complete
BLDLP-25-008437
Complete
BLDLP-25-006702
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Mar 14, 20261 change
  • Status updated from Issued to Complete
Get notified when this permit changes.
Add to Plotwise Watchlist →