• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0515197
JurisdictionTampa City
Categorybuilding
Last CheckedMar 25, 2026
Status
Issued
Job Value

$200,000.00

Owner
Priority Home Builders Corp
Address
2308 N ELCOE DR 1/2, TAMPA, FL 33603
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Priority Home Builders Corp
Parcel
1058330000
Value
$301,569.00
Year Built
1947
Stories:
1
Units:
1
Buildings:
1
Land Use Code:
0100
Zoning Acres:
147427.2752
FIRM Panel:
1201140014C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
002400
Population:
42

Preparing the map…

2308 N ELCOE DR 1/2, TAMPA, FL 33603

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 4 Applied, 1 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-09
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-09
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-04-09
Termite Cert
Termite Certification Required
Informational • 2025-05-19
Wastewater Commitment Required
A Wastewater Capacity Fee has been paid. The WW review is pending for field inspection results to determine the point of sewer connection. UTL-25-0000676
Informational • 2025-05-22

Related Records4

BLD-25-0515197
Issued
UTL-25-0000676
In Process
SPR-25-0000805
Site Plan Review Complete
SPR-25-0000670
Site Plan Review Complete
BLD-25-0515201
Complete

Frequently Asked Questions

Related Links

Related Permits

  • UTL-25-0000676 (related)
  • SPR-25-0000805 (related)
  • SPR-25-0000670 (related)
  • BLD-25-0515201 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 4 Applied, 1 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-09
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-09
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-04-09
Termite Cert
Termite Certification Required
Informational • 2025-05-19
Wastewater Commitment Required
A Wastewater Capacity Fee has been paid. The WW review is pending for field inspection results to determine the point of sewer connection. UTL-25-0000676
Informational • 2025-05-22

Related Records4

BLD-25-0515197
Issued
UTL-25-0000676
In Process
SPR-25-0000805
Site Plan Review Complete
SPR-25-0000670
Site Plan Review Complete
BLD-25-0515201
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →