• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0515669
JurisdictionTampa City
Categorybuilding
Last CheckedMar 15, 2026
Status
Revision
Job Value

$900,000.00

Owner
Stress Free Construction Llc
Address
3106 W COACHMAN AVE, TAMPA, FL 33611
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
AESFHABFE 10 ft
Advanced details
Owner
Stress Free Construction Llc
Parcel
1278630005
Value
$212,121.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
0000
Zoning Acres:
147427.2752
FIRM Panel:
1201140038C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
006700
Population:
58

Preparing the map…

3106 W COACHMAN AVE, TAMPA, FL 33611

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-29
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-29
Final Private Provider Inspection Report
Final Private Provider Inspection Report is required to be uploaded to the permit record and approved prior to COO/COC
Informational • 2025-05-09
FEMA flood elevation certificate
FEMA flood elevation certificate required prior to C/O
Informational • 2025-05-27
Termite Certificate
Termite certification required prior to C/O
Informational • 2025-05-27

Related Records4

BLD-25-0515669
Revision
UTL-25-0000838
In Process
SPR-25-0000829
Site Plan Review Complete
BLDLP-25-007538
Complete
BLDLP-25-007954
Complete

Frequently Asked Questions

Related Links

Related Permits

  • UTL-25-0000838 (related)
  • SPR-25-0000829 (related)
  • BLDLP-25-007538 (related)
  • BLDLP-25-007954 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-04-29
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-04-29
Final Private Provider Inspection Report
Final Private Provider Inspection Report is required to be uploaded to the permit record and approved prior to COO/COC
Informational • 2025-05-09
FEMA flood elevation certificate
FEMA flood elevation certificate required prior to C/O
Informational • 2025-05-27
Termite Certificate
Termite certification required prior to C/O
Informational • 2025-05-27

Related Records4

BLD-25-0515669
Revision
UTL-25-0000838
In Process
SPR-25-0000829
Site Plan Review Complete
BLDLP-25-007538
Complete
BLDLP-25-007954
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →