• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0515884
JurisdictionTampa City
Categorybuilding
Last CheckedMar 23, 2026
Status
Issued
Job Value

$500,000.00

Owner
Cigar City Builders Llc
Address
205 W GLADYS ST 1, TAMPA, FL 33602
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Cigar City Capital Group Llc
Parcel
1826800003
Value
$75,029.00
Acreage:
0.07
Land Use Code:
1000
Land Use Group:
VACANT COMM.
Zoning Acres:
147440.3701
FIRM Panel:
1201140024C
Flood Source:
12057C_STUDY5
Census Tract:
002900
Population:
26
Legal Description

Rosebury Park, East 1/2 Of Lot 3 Block 2

Preparing the map…

205 W GLADYS ST 1, TAMPA, FL 33602

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

NSF check - fees due
NSF checks "insufficient funds" (2 separate projects): BLD-18-0461375 ($628.76 + $40.00 fee = $688.76 total due); BLD-18-0461379 ($628.76 + $40.00 fee = $688.76 total due);
Informational • 2018-10-02
Building - 5 Applied, 1 Complied, 1 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-05-08
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-05-08
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-05-08
Termite Cert
Termite Certification Required
Informational • 2025-07-01

Related Records11

BLD-25-0515884
Issued
SPR-25-0002985
Site Plan Review Complete
BLDCO-25-000529
Complete
BLDCO-25-000825
Complete
BLDCO-25-000815
Complete
BLDLP-25-007162
Complete
SPR-25-0001493
Site Plan Review Complete
BLD-25-0515895
Issued
BLDLP-25-007139
Complete
BDE-25-0444653
Complete
UTL-25-0000859
In Process
BDE-25-0444682
Complete

Frequently Asked Questions

Related Links

Related Permits

  • SPR-25-0002985 (related)
  • BLDCO-25-000529 (related)
  • BLDCO-25-000825 (related)
  • BLDCO-25-000815 (related)
  • BLDLP-25-007162 (related)
  • SPR-25-0001493 (related)
  • BLD-25-0515895 (related)
  • BLDLP-25-007139 (related)
  • BDE-25-0444653 (related)
  • UTL-25-0000859 (related)
  • BDE-25-0444682 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

NSF check - fees due
NSF checks "insufficient funds" (2 separate projects): BLD-18-0461375 ($628.76 + $40.00 fee = $688.76 total due); BLD-18-0461379 ($628.76 + $40.00 fee = $688.76 total due);
Informational • 2018-10-02
Building - 5 Applied, 1 Complied, 1 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-05-08
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-05-08
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-05-08
Termite Cert
Termite Certification Required
Informational • 2025-07-01

Related Records11

BLD-25-0515884
Issued
SPR-25-0002985
Site Plan Review Complete
BLDCO-25-000529
Complete
BLDCO-25-000825
Complete
BLDCO-25-000815
Complete
BLDLP-25-007162
Complete
SPR-25-0001493
Site Plan Review Complete
BLD-25-0515895
Issued
BLDLP-25-007139
Complete
BDE-25-0444653
Complete
UTL-25-0000859
In Process
BDE-25-0444682
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →