• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0516037
JurisdictionTampa City
Categorybuilding
Last CheckedMar 27, 2026
Status
Issued
Owner
Grace Lutheran Church
Address
3703 E DR MARTIN LUTHER KING JR BLVD, TAMPA, FL 33610
Zoning
COMMUNITY COMMERCIAL-35 (2.0 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Grace Mary Missionary Baptist Church
Parcel
1751330000
Value
$400,900.00
Year Built
1954
Stories:
1
Units:
0
Buildings:
1
Land Use Code:
1630
Zoning Acres:
147427.2752
FIRM Panel:
1201140016C
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
003400
Population:
0

Preparing the map…

3703 E DR MARTIN LUTHER KING JR BLVD, TAMPA, FL 33610

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 4 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-05-14
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-05-14
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-05-14
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-05-14
Default - 1 Complied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-05-14

Related Records7

BLD-25-0516037
Issued
BLD-25-0516039
Complete
UTL-25-0001254
In Process
SPR-25-0000057
Site Plan Review Complete
SPR-25-0002219
Site Plan Review Complete
SPR-25-0000706
Site Plan Review Complete
BLD-25-0517469
Issued
BLDLP-25-006287
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-25-0516039 (related)
  • UTL-25-0001254 (related)
  • SPR-25-0000057 (related)
  • SPR-25-0002219 (related)
  • SPR-25-0000706 (related)
  • BLD-25-0517469 (related)
  • BLDLP-25-006287 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 4 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-05-14
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-05-14
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-05-14
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-05-14
Default - 1 Complied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-05-14

Related Records7

BLD-25-0516037
Issued
BLD-25-0516039
Complete
UTL-25-0001254
In Process
SPR-25-0000057
Site Plan Review Complete
SPR-25-0002219
Site Plan Review Complete
SPR-25-0000706
Site Plan Review Complete
BLD-25-0517469
Issued
BLDLP-25-006287
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →