• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0516156
JurisdictionTampa City
Categorybuilding
Last CheckedMar 28, 2026
Status
Issued
Job Value

$678,340.00

Owner
Oneil Equities Llc
Address
1224 E CHELSEA ST, TAMPA, FL 33603
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Oneil Equities Llc
Parcel
1720100000
Value
$323,920.00
Square Feet
1262
Year Built
1954
Stories:
1
Units:
1
Buildings:
1
Acreage:
0.26
Land Use Code:
0100
Land Use Group:
SINGLE FAMILY
Zoning Acres:
147440.3701
FIRM Panel:
1201140015C
Flood Source:
12057C_STUDY5
Census Tract:
002100
Population:
56
Legal Description

Nebraska Heights, Lots 23 And 24 Block 6

Preparing the map…

1224 E CHELSEA ST, TAMPA, FL 33603

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-05-20
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-05-20
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-05-20
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-05-20
Termite Cert
Termite Certification Required
Informational • 2025-07-31

Related Records3

BLD-25-0516156
Issued
BDE-25-0444471
Complete
SPR-25-0001637
Site Plan Review Complete
UTL-25-0000886
In Progress

Frequently Asked Questions

Related Links

Related Permits

  • BDE-25-0444471 (related)
  • SPR-25-0001637 (related)
  • UTL-25-0000886 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-05-20
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-05-20
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-05-20
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-05-20
Termite Cert
Termite Certification Required
Informational • 2025-07-31

Related Records3

BLD-25-0516156
Issued
BDE-25-0444471
Complete
SPR-25-0001637
Site Plan Review Complete
UTL-25-0000886
In Progress
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Mar 28, 20261 change
  • Status updated from Pending to Issued
Get notified when this permit changes.
Add to Plotwise Watchlist →