• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0516356
JurisdictionTampa City
Categorybuilding
Last Checked12 hours ago
Status
In Process
Job Value

$723,000.00

Owner
Todd W Willis And Mary Fournier
Address
1505 S SHERIDAN FOREST DR, TAMPA, FL 33629
Risk
AEBFE 9 ft
Advanced details
Owner
Todd W Willis And Mary Fournier
Parcel
1210650000
Value
$517,276.00
Square Feet
2966
Year Built
1967
Stories:
1
Units:
1
Buildings:
1
Acreage:
0.31
Land Use Code:
0100
Land Use Group:
SINGLE FAMILY
Zoning Acres:
147440.3701
FIRM Panel:
1201140031C
Flood Source:
12057C_FIS1
Census Tract:
005900
Population:
219
Legal Description

Sheridan Subdivision, N 1/2 Of Lot 13 And Lot 14 Block 1

Preparing the map…

1505 S SHERIDAN FOREST DR, TAMPA, FL 33629

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-05-29
Default - 1 Complied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-05-29
Building - 3 Applied, 1 Not Applicable - Building Permit - Flood Certificate Required
Flood Certificate Required
Informational • 2025-07-15
Termite Cert
Termite Certification Required
Informational • 2025-07-15
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-08-01

Related Records6

BLD-25-0516356
In Process
BLDLP-25-008548
Complete
SPR-25-0000909
Site Plan Review Complete
SPR-25-0001739
Site Plan Review Complete
BLD-25-0516360
Complete
BLDLP-25-008710
Complete
UTL-25-0000955
In Process

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-25-008548 (related)
  • SPR-25-0000909 (related)
  • SPR-25-0001739 (related)
  • BLD-25-0516360 (related)
  • BLDLP-25-008710 (related)
  • UTL-25-0000955 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-05-29
Default - 1 Complied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-05-29
Building - 3 Applied, 1 Not Applicable - Building Permit - Flood Certificate Required
Flood Certificate Required
Informational • 2025-07-15
Termite Cert
Termite Certification Required
Informational • 2025-07-15
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-08-01

Related Records6

BLD-25-0516356
In Process
BLDLP-25-008548
Complete
SPR-25-0000909
Site Plan Review Complete
SPR-25-0001739
Site Plan Review Complete
BLD-25-0516360
Complete
BLDLP-25-008710
Complete
UTL-25-0000955
In Process
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
12 hours ago1 change
  • Status updated from Issued to In Process
Get notified when this permit changes.
Add to Plotwise Watchlist →