• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0516403
JurisdictionTampa City
Categorybuilding
Last CheckedMar 20, 2026
Status
Revision
Job Value

$130,000.00

Owner
Eduardo And Nubia Arias
Address
1719 W PERIO ST, TAMPA, 33612 VIEW ADDITIONAL LOCATIONS>>1)1721 W PERIO ST, TAMPA, FL 33612
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Eduardo And Nubia Arias
Parcel
0977160000
Value
$59,670.00
Acreage:
0.15
Land Use Code:
0000
Land Use Group:
VACANT RESIDENT
Zoning Acres:
147440.3701
FIRM Panel:
1201140001C
Flood Source:
12057C_STUDY4
Census Tract:
000500
Population:
67
Legal Description

Tampa's North Side Country Club Area Unit No 1, Southgate, Lot 11 Block 38

Preparing the map…

1719 W PERIO ST, TAMPA, 33612 VIEW ADDITIONAL LOCATIONS>>1)1721 W PERIO ST, TAMPA, FL 33612

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 3 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-05-30
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-05-30
Default - 1 Applied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-05-30
Termite Cert
Termite Certification Required
Informational • 2025-07-17

Related Records6

BLD-25-0516403
Revision
SPR-25-0000989
Site Plan Review Complete
UTL-25-0001005
In Process
BLDCO-25-000326
Complete
BLD-25-0517157
Complete
SPR-25-0002479
Site Plan Review Complete
BLDLP-25-008432
Complete

Frequently Asked Questions

Related Links

Related Permits

  • SPR-25-0000989 (related)
  • UTL-25-0001005 (related)
  • BLDCO-25-000326 (related)
  • BLD-25-0517157 (related)
  • SPR-25-0002479 (related)
  • BLDLP-25-008432 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 3 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-05-30
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-05-30
Default - 1 Applied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-05-30
Termite Cert
Termite Certification Required
Informational • 2025-07-17

Related Records6

BLD-25-0516403
Revision
SPR-25-0000989
Site Plan Review Complete
UTL-25-0001005
In Process
BLDCO-25-000326
Complete
BLD-25-0517157
Complete
SPR-25-0002479
Site Plan Review Complete
BLDLP-25-008432
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Feb 2, 20261 change
  • Status updated from Issued to Revision
Get notified when this permit changes.
Add to Plotwise Watchlist →