• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0516514
JurisdictionTampa City
Categorybuilding
Last CheckedMar 25, 2026
Status
Issued
Job Value

$200,000.00

Owner
Royalty Global Investments Llc
Address
7402 S JUANITA ST, TAMPA, FL 33616
Risk
AEBFE 9 ft
Advanced details
Owner
Royalty Global Investments Llc
Parcel
1390480005
Value
$100,000.00
Acreage:
0.11
Land Use Code:
0000
Land Use Group:
VACANT RESIDENT
Zoning Acres:
147440.3701
FIRM Panel:
1201140043C
Flood Source:
12057C_FIS1
Census Tract:
007200
Population:
85
Legal Description

Port Tampa City Map, Lot 16 Block 186 And W 1/2 Closed Alley, Abutting Thereon

Preparing the map…

7402 S JUANITA ST, TAMPA, FL 33616

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-06-06
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-06-06
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-06-06
Flood Certificate Required
Flood Certificate Required
Informational • 2025-07-24
Termite Cert
Termite Certification Required
Informational • 2025-07-24

Related Records4

BLD-25-0516514
Issued
UTL-25-0001038
In Progress
BLDCO-25-000310
Complete
SPR-25-0000977
Site Plan Review Complete
BLDCO-25-000790
Complete

Frequently Asked Questions

Related Links

Related Permits

  • UTL-25-0001038 (related)
  • BLDCO-25-000310 (related)
  • SPR-25-0000977 (related)
  • BLDCO-25-000790 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-06-06
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-06-06
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-06-06
Flood Certificate Required
Flood Certificate Required
Informational • 2025-07-24
Termite Cert
Termite Certification Required
Informational • 2025-07-24

Related Records4

BLD-25-0516514
Issued
UTL-25-0001038
In Progress
BLDCO-25-000310
Complete
SPR-25-0000977
Site Plan Review Complete
BLDCO-25-000790
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →