• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0516709
JurisdictionTampa City
CategoryBuilding
Last CheckedMar 20, 2026
Status
Complete
Owner
Gvi-Ip Tampa Hotel Owner Llc
Address
3000 BAYPORT DR, TAMPA, FL 33607
Zoning
COMMUNITY COMMERCIAL-35 (2.0 FAR)
Risk
AESFHABFE 9 ft
Advanced details
Owner
Gvi-Ip Tampa Office Owner Llc
Parcel
0946360000
Value
$57,197,100.00
Square Feet
262369
Year Built
1985
Stories:
15
Units:
0
Buildings:
2
Acreage:
14.68
Land Use Code:
1810
Zoning Acres:
147440.3587
FIRM Panel:
1201140021C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
011708
Population:
0

Preparing the map…

3000 BAYPORT DR, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Total $1,204.52 · Paid $1,204.52 · Outstanding $0.00
Paid fee$679.30PaidAug 05, 2025—
Paid fee$16.98PaidAug 05, 2025—
Paid fee$44.06PaidAug 05, 2025—
Paid fee$402.86PaidJun 30, 2025—
Paid fee$11.32PaidJun 30, 2025—
Paid fee$50.00PaidJun 17, 2025—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURE PLANS
Hotel Development >350 rooms
Informational • 2016-05-31
Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-06-17
Building - Utilities - Wastewater Commitment Required
Project has minimal plumbing only with no change of use. Water department has determined that the existing meter is adequate and there is no increase in ERCs; therefore, no wastewater review is required. If you have any questions, comments, or concerns, please contact Zaid Rivera-Roman at Zaid.Rivera-Roman@tampagov.net or at 813.274.7869
Informational • 2025-06-20
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-06-20
Certificate of Occupancy Hold for Wastewater
Project has minimal plumbing only with no change of use. Water department has determined that the existing meter is adequate and there is no increase in ERCs; therefore, no wastewater review is required. If you have any questions, comments, or concerns, please contact Zaid Rivera-Roman at Zaid.Rivera-Roman@tampagov.net or at 813.274.7869
Informational • 2025-06-20
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-06-20
Utility Application Submittal
A Utility application does not need to be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-06-20
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-10-10
Building - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2025-10-10
Utilities - Certificate of Occupancy Hold for Water (backflow)
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2025-10-16

Related Records7

BLD-25-0516709
Complete
BLDLP-25-008779
Complete
BLDLP-25-008599
Complete
BLDLP-25-009611
Complete
BLD-25-0516709-REV1
Complete
BLDLP-25-008600
Complete
BLDLP-25-009030
Complete
BLDLP-25-008727
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-25-008779 (child)
  • BLDLP-25-008599 (child)
  • BLDLP-25-009611 (child)
  • BLD-25-0516709-REV1 (child)
  • BLDLP-25-008600 (child)
  • BLDLP-25-009030 (child)
  • BLDLP-25-008727 (child)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Total $1,204.52 · Paid $1,204.52 · Outstanding $0.00
Paid fee$679.30PaidAug 05, 2025—
Paid fee$16.98PaidAug 05, 2025—
Paid fee$44.06PaidAug 05, 2025—
Paid fee$402.86PaidJun 30, 2025—
Paid fee$11.32PaidJun 30, 2025—
Paid fee$50.00PaidJun 17, 2025—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURE PLANS
Hotel Development >350 rooms
Informational • 2016-05-31
Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-06-17
Building - Utilities - Wastewater Commitment Required
Project has minimal plumbing only with no change of use. Water department has determined that the existing meter is adequate and there is no increase in ERCs; therefore, no wastewater review is required. If you have any questions, comments, or concerns, please contact Zaid Rivera-Roman at Zaid.Rivera-Roman@tampagov.net or at 813.274.7869
Informational • 2025-06-20
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-06-20
Certificate of Occupancy Hold for Wastewater
Project has minimal plumbing only with no change of use. Water department has determined that the existing meter is adequate and there is no increase in ERCs; therefore, no wastewater review is required. If you have any questions, comments, or concerns, please contact Zaid Rivera-Roman at Zaid.Rivera-Roman@tampagov.net or at 813.274.7869
Informational • 2025-06-20
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-06-20
Utility Application Submittal
A Utility application does not need to be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-06-20
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-10-10
Building - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2025-10-10
Utilities - Certificate of Occupancy Hold for Water (backflow)
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2025-10-16

Related Records7

BLD-25-0516709
Complete
BLDLP-25-008779
Complete
BLDLP-25-008599
Complete
BLDLP-25-009611
Complete
BLD-25-0516709-REV1
Complete
BLDLP-25-008600
Complete
BLDLP-25-009030
Complete
BLDLP-25-008727
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →