• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0516834
JurisdictionTampa City
CategoryBuilding
Last CheckedMar 10, 2026
Status
Complete
Owner
Bcl Homes Llc
Address
3223 W PAXTON AVE, TAMPA, FL 33611
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Bcl Homes Llc
Parcel
1341720000
Value
$216,881.00
Square Feet
1408
Year Built
1947
Stories:
1
Units:
1
Buildings:
1
Acreage:
0.14
Land Use Code:
0100
Zoning Acres:
147440.3587
FIRM Panel:
1201140038C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
006801
Population:
34

Preparing the map…

3223 W PAXTON AVE, TAMPA, FL 33611

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Total $2,181.64 · Paid $2,181.64 · Outstanding $0.00
Paid fee$1,277.06PaidJul 15, 2025—
Paid fee$31.93PaidJul 15, 2025—
Paid fee$801.37PaidJun 30, 2025—
Paid fee$21.28PaidJun 30, 2025—
Paid fee$50.00PaidJun 23, 2025—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-06-23
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-06-23
Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-06-23
required mitigation
7 type 1 trees and 2 palms are required as mitigation
Informational • 2025-07-01
Termite Cert
Termite Certification Required
Informational • 2025-07-15

Related Records6

SPR-25-0002318
Site Plan Review Complete

Frequently Asked Questions

Related Links

Related Permits

  • SPR-25-0002318 (parent)
  • UTL-25-0001060 (child)
  • BLDLP-25-009057 (child)
  • BLDLP-25-009056 (child)
  • BDE-25-0444741 (child)
  • BLDLP-25-009062 (child)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Total $2,181.64 · Paid $2,181.64 · Outstanding $0.00
Paid fee$1,277.06PaidJul 15, 2025—
Paid fee$31.93PaidJul 15, 2025—
Paid fee$801.37PaidJun 30, 2025—
Paid fee$21.28PaidJun 30, 2025—
Paid fee$50.00PaidJun 23, 2025—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-06-23
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-06-23
Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-06-23
required mitigation
7 type 1 trees and 2 palms are required as mitigation
Informational • 2025-07-01
Termite Cert
Termite Certification Required
Informational • 2025-07-15

Related Records6

SPR-25-0002318
Site Plan Review Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Mar 10, 20261 change
  • Status updated from Issued to Complete
Get notified when this permit changes.
Add to Plotwise Watchlist →