Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-07-28
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-07-28
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-07-28
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-07-28
Building - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-07-28
DEMO permit required prior to Issuance
If this new construction application does not include demo then a separate demolition permit is required prior to issuance
Informational • 2025-08-06
FEMA flood elevation certificate
FEMA flood elevation certificate required prior to C/O
Informational • 2025-08-26
Termite Certificate
Termite Certification required prior to C/O
Informational • 2025-08-26
Building - Building Plans - Legislative Lock
This project record is about to expire/become void by State Statute(553.792) timelines within 7 days, please resubmit or provide waiver form which is located on the CSD website and contact the facilitator team to release the waiver at 813-274-3100 option 1
Informational • 2025-09-25