• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0517720
JurisdictionTampa City
Categorybuilding
Last CheckedMar 24, 2026
Status
In Process
Owner
Roberto And Odalys Albizar
Address
2225 E 113TH AVE, TAMPA, FL 33612
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Roberto And Odalys Albizar
Parcel
1410780000
Value
$226,773.00
Square Feet
1353
Year Built
1969
Stories:
1
Units:
1
Buildings:
1
Acreage:
0.15
Land Use Code:
0100
Land Use Group:
SINGLE FAMILY
Zoning Acres:
147440.3701
FIRM Panel:
1201140003C
Flood Source:
12057C_STUDY4
Census Tract:
000202
Population:
130
Legal Description

Sherwood Heights Unit No 3, W 2.5 Ft Of Lot 7 And E 58.5 Ft Of Lot 8 Block 5

Preparing the map…

2225 E 113TH AVE, TAMPA, FL 33612

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-08-01
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-08-01
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net and Wastewater directly at (813)-274-8065 or Wastewatercommitment@Tampagov.Net
Informational • 2025-08-01
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-08-01
Termite Cert
Termite Certification Required
Informational • 2025-08-20

Related Records8

BLD-25-0517720
In Process
BLD-25-0516263
Revision
SPR-25-0001957
Site Plan Review Complete
BLDCO-25-000734
Complete
BLDLP-25-007803
Complete
BLD-25-0517718
Issued
SPR-25-0002009
Site Plan Review Complete
BLD-25-0516263-REV1
Complete
BLDLP-25-007685
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-25-0516263 (related)
  • SPR-25-0001957 (related)
  • BLDCO-25-000734 (related)
  • BLDLP-25-007803 (related)
  • BLD-25-0517718 (related)
  • SPR-25-0002009 (related)
  • BLD-25-0516263-REV1 (related)
  • BLDLP-25-007685 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-08-01
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-08-01
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net and Wastewater directly at (813)-274-8065 or Wastewatercommitment@Tampagov.Net
Informational • 2025-08-01
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-08-01
Termite Cert
Termite Certification Required
Informational • 2025-08-20

Related Records8

BLD-25-0517720
In Process
BLD-25-0516263
Revision
SPR-25-0001957
Site Plan Review Complete
BLDCO-25-000734
Complete
BLDLP-25-007803
Complete
BLD-25-0517718
Issued
SPR-25-0002009
Site Plan Review Complete
BLD-25-0516263-REV1
Complete
BLDLP-25-007685
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Feb 2, 20261 change
  • Status updated from Awaiting Client Reply to In Process
Get notified when this permit changes.
Add to Plotwise Watchlist →