• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0517792
JurisdictionTampa City
Categorybuilding
Last Checked2 days ago
Status
Issued
Owner
Yovannys Sanchez Corales
Address
1911 W HUMPHREY ST, TAMPA, FL 33604
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Yovannys Sanchez Corales
Parcel
0984310000
Value
$350,739.00
Square Feet
1490
Year Built
1959
Stories:
1
Units:
1
Buildings:
1
Acreage:
0.19
Land Use Code:
0100
Land Use Group:
SINGLE FAMILY
Zoning Acres:
147440.3701
FIRM Panel:
1201140005C
Flood Source:
12057C_STUDY4
Census Tract:
000601
Population:
32
Legal Description

Wilma North Unit No 3, E 1/2 Of Lot 118-A And Lot 119 And Closed, Alley Abutting On N

Preparing the map…

1911 W HUMPHREY ST, TAMPA, FL 33604

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2024-09-05
Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-08-05
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-08-05
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net and Wastewater directly at (813)-274-8065 or Wastewatercommitment@Tampagov.Net
Informational • 2025-08-05
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-08-05

Related Records

Track this permit to view related recordsStart Free Trial

Frequently Asked Questions

Related Links

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2024-09-05
Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-08-05
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-08-05
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net and Wastewater directly at (813)-274-8065 or Wastewatercommitment@Tampagov.Net
Informational • 2025-08-05
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-08-05

Related Records

Track this permit to view related recordsStart Free Trial
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
2 days ago1 change
  • Status updated from Expired to Issued
6 days ago1 change
  • Status updated from About to Expire to Expired
Mar 24, 20261 change
  • Status updated from Issued to About to Expire
Feb 2, 20261 change
  • Status updated from In Process to Issued
Get notified when this permit changes.
Add to Plotwise Watchlist →