• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0519018
JurisdictionTampa City
Categorybuilding
Last CheckedMar 25, 2026
Status
Awaiting Client Reply
Owner
Reflection Custom Homes Florida Llc
Address
4103 W DE LEON ST, TAMPA, FL 33609
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Reflection Custom Homes Florida Llc
Parcel
1160190005
Value
$307,365.00
00
Stories:
0
Units:
0
Buildings:
0
Acreage:
0.18
Land Use Code:
0000
Zoning Acres:
147440.3587
FIRM Panel:
1201140022C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
005800
Population:
36

Preparing the map…

4103 W DE LEON ST, TAMPA, FL 33609

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Total $50.00 · Paid $50.00 · Outstanding $0.00
Paid fee$50.00PaidSep 29, 2025—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-09-29
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-09-29
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-09-29
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-09-29
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-09-29
Building - Utilities - Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-09-29
Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-09-29

Related Records2

SPR-25-0003202
Site Plan Review Complete

Frequently Asked Questions

Related Links

Related Permits

  • SPR-25-0003202 (parent)
  • UTL-25-0001515 (child)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Total $50.00 · Paid $50.00 · Outstanding $0.00
Paid fee$50.00PaidSep 29, 2025—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-09-29
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-09-29
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-09-29
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-09-29
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-09-29
Building - Utilities - Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-09-29
Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-09-29

Related Records2

SPR-25-0003202
Site Plan Review Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →