• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLDCO-25-000374
JurisdictionTampa City
CategoryBuilding
Last CheckedMar 27, 2026
Status
Complete
Description

Add Contact to a Building Record

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Trees removed without permit
See the photo in the attachments. Pending investgation
Informational • 2024-07-12
Required mitigation
The total required tree mitigation for unauthorized tree removal includes: four 2.5-inch caliper Type 2 trees, two 2.5-inch caliper Type 3 trees, two 6-foot clear trunk palms, and three 3-inch caliper penalty trees
Informational • 2024-08-16
Building - 3 Applied, 1 Released - Building Permit - Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2024-08-23
“Declaration of Land Restriction (Non-Conversion Agreement)
FEMA- need to complete “Declaration of Land Restriction (Non-Conversion Agreement) - Fillable with Instructions. Once competed need to record Non-Conversion Agreement at the courthouse and upload the recorded copy to the record
Informational • 2024-11-07

Related Records

Track this permit to view related recordsStart Free Trial

Frequently Asked Questions

Related Links

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Trees removed without permit
See the photo in the attachments. Pending investgation
Informational • 2024-07-12
Required mitigation
The total required tree mitigation for unauthorized tree removal includes: four 2.5-inch caliper Type 2 trees, two 2.5-inch caliper Type 3 trees, two 6-foot clear trunk palms, and three 3-inch caliper penalty trees
Informational • 2024-08-16
Building - 3 Applied, 1 Released - Building Permit - Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2024-08-23
“Declaration of Land Restriction (Non-Conversion Agreement)
FEMA- need to complete “Declaration of Land Restriction (Non-Conversion Agreement) - Fillable with Instructions. Once competed need to record Non-Conversion Agreement at the courthouse and upload the recorded copy to the record
Informational • 2024-11-07

Related Records

Track this permit to view related recordsStart Free Trial
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →