Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-22-0000095 for steel bar joists and decking, structural steel connections, storefront and window wall systems, exterior cold-formed metal framing, mechanical equipment and curbs, Alucobond cladding attachment, ladders and railings. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by revision record by the building official or designee. The condition will be affirmatively noted on the record as a revision to the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2022-08-19
Building - 2 Applied - Building Plans - Approved Parking lease
Approval is conditioned on an amended lease being approved by the Hillsborough County School Board at their October 2022 hearing. DE1-22-0000208
Informational • 2022-09-16