Building - 1 Applied - Building Permit - As-Built Topo Survey
An As-Built Topo Survey will need to be uploaded to the record before the BLD - Final inspection is scheduled, in order to confirm that all illegal fill was removed from the site and the required elevations have been re-established
Informational • 2023-07-18