Building - 1 Applied - Building Plans - Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-23-0000117 for Autoclaved Aerated Panels, Pre-Engineered Steel Plan Stairs, Rooftop Accessories, Decorative Aluminum Railings, Pre-Engineered Wood Components, Pre-Engineered Wood Trusses, Standing Seam Metal Roofing, Fiber Cement Siding, Aluminum Louvers/Shutters and Electrical Switchboard Coordination Study (Emergency System - Level 1). The deferred submittal items shall not be installed until the deferred submittal documents have been approved by revision record by the building official or designee. The condition will be affirmatively noted on the record as a revision to the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2022-11-21