Transportation Mitigation due
Per the approved traffic study for this project, prior to the issuance of the first building permit, a mitigation payment of up to $12,101 to the Mobility Department for improvements in the Central East District
Informational • 2022-02-28
Arborist Report Required - Several Non-Hazardous Grand Trees on Site
See attached arborist report filed under IR2.0 Irrigation Details. Please note that there was a variance applied for and withdrawn for the removal of several non-hazardous grand trees on this site. Arborist report is required and all non-hazardous grand trees are required to be saved. Natural Resources may be required to verify the arborist report
Informational • 2022-08-18
Building - 4 Applied - Building Permit - DAS / BDA system required.
DAS / BDA system required
Informational • 2022-08-30
Retaining walls by others
Retaining walls by others will need to Submit a revision with Plans for the retaining before construction
Informational • 2023-09-20