Building - 1 Applied - Building Permit - See TRE-24-0000758 Consultation Only
Evaluated live oak on the west side 35" C-9 per Dave Reilly. TECO has pruned large structural limbs from the ROW. All the weight and remaining canopy is over the lot to be developed. Several failures are evident including a 4"-6" recent. Most other failures are 1"-2" failures. Codominant trunk with included bark between co-dominant stems. Insect frass is observed. Ok - C-9
Informational • 2024-05-21