• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLDLP-25-009949
JurisdictionTampa City
Categorybuilding
Last CheckedMar 27, 2026
Status
Complete

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

IRW-23-10- DRI Conditions
IRW-23-10- DRI Conditions- See conditions 1-5 to be completed as required
Informational • 2024-08-15
TIA Airport Height Zone Permit
TIA Airport Height Zone Permit required for Building over 30'
Informational • 2024-08-15
Building - Building Permit - TRANSPORTATION MITIGATION FEE PRIOR TO THE ISSUANCE OF A VERTICAL BUILDING PERMIT FOR ANY RESIDENTIAL STRUCTURE,
PRIOR TO THE ISSUANCE OF A VERTICAL BUILDING PERMIT FOR ANY RESIDENTIAL STRUCTURE, THE DEVELOPER WILL PAY THE CITY OF TAMPA A TRANSPORTATION MITIGATION FEE OF UP TO $249,481, TO BE PAID ON A BUILDING BY BUILDING BASIS AT A RATE OF $226.80 PER DWELLING UNIT FOR EACH UNIT WITHIN A BUILDING FOR WHICH VERTICAL BUILDING PERMITS ARE BEING SOUGHT. THESE PAYMENTS WILL BE USED FOR TRANSPORTATION IMPROVEMENTS TO INDEPENDENCE PARKWAY, GEORGE ROAD, AND MEMORIAL HIGHWAY WITHIN THE VICINITY OF THE SITE. THE DEVELOPER MAY APPLY FOR MOBILITY FEE CREDITS FOR THESE CONTRIBUTIONS IN ACCORDANCE WITH THE TRANSPORTATION MULTI-MODAL IMPACT FEE ORDINANCE
Informational • 2024-08-15
Building - Building Permit - THRESHOLD BUILDING
—
Informational • 2024-12-12
Flood Certificate Required
Flood Certificate Required
Informational • 2025-02-21
Termite Cert
Termite Certification Required
Informational • 2025-02-21
PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT FOR VERTICAL CONSTRUCTION, THE DEVELOPER WILL CONTRIBUTE UP TO $50,000 TO HARTLINE
PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT FOR VERTICAL CONSTRUCTION, THE DEVELOPER WILL CONTRIBUTE UP TO $50,000 TO HARTLINE TO CONSTRUCT IMPROVEMENTS AT THE EXISTING BUS STOP ADJACENT TO THE DEVELOPMENT ALONG MEMORIAL HIGHWAY WEST OF THE INTERSECTION WITH GEORGE ROAD. THE DEVELOPER WILL PROVIDE APPROPRIATE EASEMENTS TO HARTLINE FOR THE PLACEMENT OF THE BUS BAY, SHELTER, LANDING PAD AND BIKE RACK WITH CONNECTIVITY TO THE EXISTING TRAIL AND SIDEWALKS ALONG MEMORIAL HIGHWAY
Informational • 2025-02-26

Related Records10

BLD-24-0509317
Pending

Frequently Asked Questions

Related Links

Related Permits

  • BLD-24-0509317 (parent)
  • BLD-25-0516663 (child)
  • BLD-24-0511477 (child)
  • CBO-25-0000032 (child)
  • REZ-17-0000001 (child)
  • BLDLP-25-009776 (child)
  • BLDLP-25-009546 (child)
  • UTL-24-0001731 (child)
  • BLD-24-0509317-REV1 (child)
  • BLDLP-25-003973 (child)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

IRW-23-10- DRI Conditions
IRW-23-10- DRI Conditions- See conditions 1-5 to be completed as required
Informational • 2024-08-15
TIA Airport Height Zone Permit
TIA Airport Height Zone Permit required for Building over 30'
Informational • 2024-08-15
Building - Building Permit - TRANSPORTATION MITIGATION FEE PRIOR TO THE ISSUANCE OF A VERTICAL BUILDING PERMIT FOR ANY RESIDENTIAL STRUCTURE,
PRIOR TO THE ISSUANCE OF A VERTICAL BUILDING PERMIT FOR ANY RESIDENTIAL STRUCTURE, THE DEVELOPER WILL PAY THE CITY OF TAMPA A TRANSPORTATION MITIGATION FEE OF UP TO $249,481, TO BE PAID ON A BUILDING BY BUILDING BASIS AT A RATE OF $226.80 PER DWELLING UNIT FOR EACH UNIT WITHIN A BUILDING FOR WHICH VERTICAL BUILDING PERMITS ARE BEING SOUGHT. THESE PAYMENTS WILL BE USED FOR TRANSPORTATION IMPROVEMENTS TO INDEPENDENCE PARKWAY, GEORGE ROAD, AND MEMORIAL HIGHWAY WITHIN THE VICINITY OF THE SITE. THE DEVELOPER MAY APPLY FOR MOBILITY FEE CREDITS FOR THESE CONTRIBUTIONS IN ACCORDANCE WITH THE TRANSPORTATION MULTI-MODAL IMPACT FEE ORDINANCE
Informational • 2024-08-15
Building - Building Permit - THRESHOLD BUILDING
—
Informational • 2024-12-12
Flood Certificate Required
Flood Certificate Required
Informational • 2025-02-21
Termite Cert
Termite Certification Required
Informational • 2025-02-21
PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT FOR VERTICAL CONSTRUCTION, THE DEVELOPER WILL CONTRIBUTE UP TO $50,000 TO HARTLINE
PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT FOR VERTICAL CONSTRUCTION, THE DEVELOPER WILL CONTRIBUTE UP TO $50,000 TO HARTLINE TO CONSTRUCT IMPROVEMENTS AT THE EXISTING BUS STOP ADJACENT TO THE DEVELOPMENT ALONG MEMORIAL HIGHWAY WEST OF THE INTERSECTION WITH GEORGE ROAD. THE DEVELOPER WILL PROVIDE APPROPRIATE EASEMENTS TO HARTLINE FOR THE PLACEMENT OF THE BUS BAY, SHELTER, LANDING PAD AND BIKE RACK WITH CONNECTIVITY TO THE EXISTING TRAIL AND SIDEWALKS ALONG MEMORIAL HIGHWAY
Informational • 2025-02-26

Related Records10

BLD-24-0509317
Pending
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →