• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberCBO-24-0000041
JurisdictionTampa City
CategoryBuilding
Last CheckedJan 12, 2026
Status
In Progress
Owner
Jb Mf Llc
Address
815 W LINEBAUGH AVE, TAMPA, FL 33612
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Jb Mf Llc
Parcel
0950310010
Value
$903,338.00
Acreage:
2.4
Land Use Code:
1000
Land Use Group:
VACANT COMM.
Zoning Acres:
147440.3701
FIRM Panel:
1201140002C
Flood Source:
12057C_STUDY4
Census Tract:
000402
Population:
28
Legal Description

That Part Of Sw 1/4 Of Sw 1/4 Of Sw 1/4 Of Sec 13, Twp 28 S Rge 18 E Being More Particularly Desc As:, Comm From Sw Cor Of Sw 1/4 Of Sd Sec 13 And Run, Thn Alg The W Line Thereof N 00 Deg 38 Min 52 Sec

Preparing the map…

815 W LINEBAUGH AVE, TAMPA, FL 33612

Processing Status 30

*** Install Water Service ***
Complete
——Jan 12, 2026 5:05 AM
*** Install Wastewater Service ***
Active
——Jan 12, 2026 5:05 AM
*** Install Solid Waste Service ***
Active
——Jan 12, 2026 5:05 AM

Fees

Total $50.00 · Paid $50.00 · Outstanding $0.00
Paid fee$50.00PaidAug 05, 2025—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Track this permit to view permit conditionsStart Free Trial

Related Records1

BLD-25-0517806
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-25-0517806 (parent)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status 30

*** Install Water Service ***
Complete
——Jan 12, 2026 5:05 AM
*** Install Wastewater Service ***
Active
——Jan 12, 2026 5:05 AM
*** Install Solid Waste Service ***
Active
——Jan 12, 2026 5:05 AM

Fees

Total $50.00 · Paid $50.00 · Outstanding $0.00
Paid fee$50.00PaidAug 05, 2025—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Track this permit to view permit conditionsStart Free Trial

Related Records1

BLD-25-0517806
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Jan 12, 20262 changes
  • New paid fee recorded: Invoice #1604920 for $50.00
  • Invoice #1352046 is no longer listed for $11.45 (previously Unpaid)
Jan 12, 20266 changes
  • Related record added: BLD-25-0517806
  • Related record removed: CRT-23-0000107
  • Related record removed: UTL-24-0000515
  • Related record removed: ADO-23-0000036
  • Related record removed: BLD-24-0505878
  • Related record removed: REZ-22-0000117
Jan 12, 202631 changes
  • Stage added: *** Install Water Service *** with status Complete
  • Stage added: Water Application Review with status Complete
  • Stage added: Water Commitment with status Complete
  • Stage added: Start Water Service Order with status Active
  • Stage added: Design Review with status Unknown
  • Stage added: Design with status Unknown
  • Stage added: Non-WO Install with status Complete
  • Stage added: Inspect Water Service with status Unknown
  • Stage added: WO Install with status Unknown
  • Stage added: Cross Connection Inspection with status Complete
  • Stage added: Start Water Bill with status Complete
  • Stage added: *** Install Wastewater Service *** with status Active
  • Stage added: Wastewater Application Review with status Complete
  • Stage added: Wastewater Commitment with status Complete
  • Stage added: Start Sewer Service Order with status Complete
  • Stage added: Engineering with status Unknown
  • Stage added: Inspect Private Meter with status Unknown
  • Stage added: Verify Required Documents with status Unknown
  • Stage added: Start Sewer Bill with status Active
  • Stage added: Design/Review with status Unknown
  • Stage added: Inspect Wastewater Service with status Unknown
  • Stage added: City Install Service with status Unknown
  • Stage added: *** Install Solid Waste Service *** with status Active
  • Stage added: Solid Waste Design Review with status Active
  • Stage added: Start Solid Waste Service Order with status Unknown
  • Stage removed: Application Review (was Complete)
  • Stage removed: Plans Distribution (was Active)
  • Stage removed: Plans Coordination (was Unknown)
  • Stage removed: Closure (was Unknown)
  • Stage removed: Building Review (was Unknown)
  • Stage removed: Fire Review (was Unknown)
Jan 12, 20261 change
  • Status updated from Awaiting Client Reply to In Progress
Jan 7, 20261 change
  • Permit number updated from HC-POF-23-0000064 to CBO-24-0000041
Get notified when this permit changes.
Add to Plotwise Watchlist →