Building - 5 Applied - Building Permit - DAS / BDA system required.
DAS / BDA system required
Informational • 2023-05-04
Fire alarm required.
Fire alarm required
Informational • 2023-05-04
Fire sprinkler system required.
Fire Sprinkler System Required
Informational • 2023-05-04
Hood Fire Suppression System Required.
Hood Fire Suppression System Required
Informational • 2023-05-04
Underground fire line permit required.
Underground fire line permit required
Informational • 2023-05-04