• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberUTL-23-0001998
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Pending
Description

The utility service request is for Tyson Apartments Phase 2 which will include a total of 99 additional multi-family units. The utilities needed to support the second phase of development will include fire, domestic and irrigation watermains along with sanitary sewer service. It is intended that Tyson Apartments Phase 2 will utilize the utility service connections constructed and permitted with Tyson Apartments Phase 1 (UTL-23-0000082)

Owner
Tyson Tampa Apts Llc
Address
5301 W TYSON AVE, TAMPA, FL 33611
Zoning
COMMUNITY MIXED USE-35 (2.0 FAR)
Risk
AESFHABFE 9 ft
Advanced details
Owner
Tyson Tampa Apts Llc
Parcel
1311850100
Value
$9,392,368.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
1000
Zoning Acres:
147427.2752
FIRM Panel:
1201140036C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
007102
Population:
150

Preparing the map…

5301 W TYSON AVE, TAMPA, FL 33611

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 8 Applied, 1 Complied - Building Permit - HART Bus stop
Per the approved rezoning REZ-20-66 PD site plan, see general note #13, which states: 1. Prior to the CO, applicant shall install an ADA compliant concrete pad at a location on Westshore Boulevard that HART has determined is appropriate. Given the offsite nature of the likely location, HART shall assist to ensure permitting is secured without unreasonable delay
Informational • 2022-12-28
HART Bus stop
Per the approved rezoning REZ-20-66 PD site plan, see general note #13, which states: 1. Prior to the CO, applicant shall install an ADA compliant concrete pad at a location on Westshore Boulevard that HART has determined is appropriate. Given the offsite nature of the likely location, HART shall assist to ensure permitting is secured without unreasonable delay
Informational • 2022-12-28
Transportation Mitigation due
Per the approved rezoning REZ-20-66 PD site plan: 1. Prior to the issuance of the first building permit, a mitigation payment of $99,581 shall be paid to the Transportation Division for improvements in the Interbay District area. 2. PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT, THE DEVELOPER SHALL PAY ITS PROPORTIONATE FAIR SHARE PAYMENT FOR THE DESIGN AND CONSTRUCTION OF A NEW TRAFFIC SIGNAL AT THE INTERSECTION OF W TYSON AVE AND S WESTSHORE BLVD. 3. At the time of approval of a building permit for any portion of the project, developer at that time shall contribute $174,000.00 to the City of Tampa, to be utilized for the design and/or improvement of Tyson (the "Tyson Roadway Improvements"). The city shall take such action to encumber the full contribution so that funds are allocated for the Tyson Roadway Improvements
Informational • 2022-12-28
PERMIT HOLD: Signal at Tyson and Westshore
PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT, THE DEVELOPER SHALL PAY ITS PROPORTIONATE FAIR SHARE PAYMENT FOR THE DESIGN AND CONSTRUCTION OF A NEW TRAFFIC SIGNAL AT THE INTERSECTION OF W TYSON AVE AND S WESTSHORE BLVD
Informational • 2024-01-17

Related Records15

UTL-23-0001998
Pending
BLDLP-24-004543
Complete
BLD-24-0506521
Pending
BLD-23-0497601-REV1
Complete
BLD-25-0513791
Issued
BLDLP-24-010486
Complete
BLD-25-0512050
Pending
BLDLP-24-001966
Complete
BLD-24-0505998
Pending
BLDLP-25-001875
Complete
BLDLP-24-002150
Complete
BLDLP-24-005914
Complete
CBO-24-0000053
Complete
BLDLP-24-001079
Complete
BLDLP-24-004536
Complete
BLD-23-0497601-REV2
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-004543 (related)
  • BLD-24-0506521 (related)
  • BLD-23-0497601-REV1 (related)
  • BLD-25-0513791 (related)
  • BLDLP-24-010486 (related)
  • BLD-25-0512050 (related)
  • BLDLP-24-001966 (related)
  • BLD-24-0505998 (related)
  • BLDLP-25-001875 (related)
  • BLDLP-24-002150 (related)
  • BLDLP-24-005914 (related)
  • CBO-24-0000053 (related)
  • BLDLP-24-001079 (related)
  • BLDLP-24-004536 (related)
  • BLD-23-0497601-REV2 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 8 Applied, 1 Complied - Building Permit - HART Bus stop
Per the approved rezoning REZ-20-66 PD site plan, see general note #13, which states: 1. Prior to the CO, applicant shall install an ADA compliant concrete pad at a location on Westshore Boulevard that HART has determined is appropriate. Given the offsite nature of the likely location, HART shall assist to ensure permitting is secured without unreasonable delay
Informational • 2022-12-28
HART Bus stop
Per the approved rezoning REZ-20-66 PD site plan, see general note #13, which states: 1. Prior to the CO, applicant shall install an ADA compliant concrete pad at a location on Westshore Boulevard that HART has determined is appropriate. Given the offsite nature of the likely location, HART shall assist to ensure permitting is secured without unreasonable delay
Informational • 2022-12-28
Transportation Mitigation due
Per the approved rezoning REZ-20-66 PD site plan: 1. Prior to the issuance of the first building permit, a mitigation payment of $99,581 shall be paid to the Transportation Division for improvements in the Interbay District area. 2. PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT, THE DEVELOPER SHALL PAY ITS PROPORTIONATE FAIR SHARE PAYMENT FOR THE DESIGN AND CONSTRUCTION OF A NEW TRAFFIC SIGNAL AT THE INTERSECTION OF W TYSON AVE AND S WESTSHORE BLVD. 3. At the time of approval of a building permit for any portion of the project, developer at that time shall contribute $174,000.00 to the City of Tampa, to be utilized for the design and/or improvement of Tyson (the "Tyson Roadway Improvements"). The city shall take such action to encumber the full contribution so that funds are allocated for the Tyson Roadway Improvements
Informational • 2022-12-28
PERMIT HOLD: Signal at Tyson and Westshore
PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT, THE DEVELOPER SHALL PAY ITS PROPORTIONATE FAIR SHARE PAYMENT FOR THE DESIGN AND CONSTRUCTION OF A NEW TRAFFIC SIGNAL AT THE INTERSECTION OF W TYSON AVE AND S WESTSHORE BLVD
Informational • 2024-01-17

Related Records15

UTL-23-0001998
Pending
BLDLP-24-004543
Complete
BLD-24-0506521
Pending
BLD-23-0497601-REV1
Complete
BLD-25-0513791
Issued
BLDLP-24-010486
Complete
BLD-25-0512050
Pending
BLDLP-24-001966
Complete
BLD-24-0505998
Pending
BLDLP-25-001875
Complete
BLDLP-24-002150
Complete
BLDLP-24-005914
Complete
CBO-24-0000053
Complete
BLDLP-24-001079
Complete
BLDLP-24-004536
Complete
BLD-23-0497601-REV2
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →