Early Start issued for interior non-structural work ONLY up to the point of first inspection. No structural work may be done under the authority of the Early Start, and no inspections may be scheduled until the permit is issued. Remodel of existing 2-level mercantile mall anchor store to include demolition of existing wall partitions, ceilings, fixtures and finishes; Structural demolition to allow for new stair opening, clerestory egress stair and elevator shaft; New partition walls, ceilings, finishes and fixtures, storefront system and facade, clerestory, elevator, communicating stair and egress stair; new mechanical units and distribution; new electrical distribution, devices and lighting; new plumbing rough-in and fixtures for restrooms, drinking fountains and mop sink; The following will be filed under separate permit: - Work related to the future outdoor field - Fire Sprinkler - Fire Alarm - Exterior Signage by Owner: