• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-22-0492760-REV3
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Complete
Description

Phasing plan for PCO of the Marina Building. As well as deferred submittal of the Electrical Switchboard Coordination Study (Emergency System - Level 1).

Owner
Maa Westshore Exchange Llc
Address
5434 W TYSON AVE 1201-1640, TAMPA, FL 33611
Zoning
COMMUNITY MIXED USE-35 (2.0 FAR)
Risk
AESFHABFE 9 ft
Advanced details
Owner
Se Tampa Bay Llc
Parcel
1311830010
Value
$21,143,819.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
4000
Zoning Acres:
147427.2752
FIRM Panel:
1201140036C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
007102
Population:
173

Preparing the map…

5434 W TYSON AVE 1201-1640, TAMPA, FL 33611

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-23-0000117 for Autoclaved Aerated Panels, Pre-Engineered Steel Plan Stairs, Rooftop Accessories, Decorative Aluminum Railings, Pre-Engineered Wood Components, Pre-Engineered Wood Trusses, Standing Seam Metal Roofing, Fiber Cement Siding, Aluminum Louvers/Shutters and Electrical Switchboard Coordination Study (Emergency System - Level 1). The deferred submittal items shall not be installed until the deferred submittal documents have been approved by revision record by the building official or designee. The condition will be affirmatively noted on the record as a revision to the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2022-11-21
Building - 1 Complied, 1 Applied - Building Permit - NSF Fee Due
NSF - Refer to maker NSF Fee due - (Refer to maker) Original amount due on (BLD-25-0513516) $45,650.36 + NSF Fee due $2,282.52 = Total amount due $47,932.88
Informational • 2025-05-12

Related Records14

BLD-22-0492760-REV3
Complete
BLD-22-0492760-REV1
Complete
BLD-24-0509663
Complete
BLD-23-0500930
Complete
BLD-24-0510566
Complete
BLDCO-25-000176
Complete
BLD-22-0492760-REV2
Complete
23CAP-00001665
Pending
BLD-22-0492760-REV4
Complete
BLDCO-25-001808
Complete
CBO-25-0000105
Complete
BLDCO-25-001775
Complete
BLDLP-24-001244
Complete
BLDCO-24-000641
Complete
CBO-23-0000047
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-22-0492760-REV1 (related)
  • BLD-24-0509663 (related)
  • BLD-23-0500930 (related)
  • BLD-24-0510566 (related)
  • BLDCO-25-000176 (related)
  • BLD-22-0492760-REV2 (related)
  • 23CAP-00001665 (related)
  • BLD-22-0492760-REV4 (related)
  • BLDCO-25-001808 (related)
  • CBO-25-0000105 (related)
  • BLDCO-25-001775 (related)
  • BLDLP-24-001244 (related)
  • BLDCO-24-000641 (related)
  • CBO-23-0000047 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-23-0000117 for Autoclaved Aerated Panels, Pre-Engineered Steel Plan Stairs, Rooftop Accessories, Decorative Aluminum Railings, Pre-Engineered Wood Components, Pre-Engineered Wood Trusses, Standing Seam Metal Roofing, Fiber Cement Siding, Aluminum Louvers/Shutters and Electrical Switchboard Coordination Study (Emergency System - Level 1). The deferred submittal items shall not be installed until the deferred submittal documents have been approved by revision record by the building official or designee. The condition will be affirmatively noted on the record as a revision to the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2022-11-21
Building - 1 Complied, 1 Applied - Building Permit - NSF Fee Due
NSF - Refer to maker NSF Fee due - (Refer to maker) Original amount due on (BLD-25-0513516) $45,650.36 + NSF Fee due $2,282.52 = Total amount due $47,932.88
Informational • 2025-05-12

Related Records14

BLD-22-0492760-REV3
Complete
BLD-22-0492760-REV1
Complete
BLD-24-0509663
Complete
BLD-23-0500930
Complete
BLD-24-0510566
Complete
BLDCO-25-000176
Complete
BLD-22-0492760-REV2
Complete
23CAP-00001665
Pending
BLD-22-0492760-REV4
Complete
BLDCO-25-001808
Complete
CBO-25-0000105
Complete
BLDCO-25-001775
Complete
BLDLP-24-001244
Complete
BLDCO-24-000641
Complete
CBO-23-0000047
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →