• Clarification on the demolition along the south exterior wall (RE: sill beam), please refer to sheet A0 • The sealed letter from consulting structural engineer regarding existing column base plate is attached. • Storefront replacement at the existing opening, please refer to A1, A4.1, A5 • Drinking fountain and future grease line added to plans. Mop sink relocated. Please refer to A1.2 and P-sheets • Air curtains added above ground-floor doors. Please refer to A2, A4.1 • Door schedule updated to match revisions. Please refer to A3 • Restroom accessory schedule updated for clarity. Please refer to A4 • Interior elevations revised to match revisions, please refer to A4.1-A4.3. • Key note schedule added to interior elevations. Please refer to A4.1-A4.3 • Exterior elevations have been revised to match revisions. Please refer to A5-A5.2 • Existing guardrails will remain instead of installing the tempered glass railings. Please refer to A5-A5.2 • Interior soffit detail revised to match revisions. Please refer to A6.3 • Circuiting for air curtains has been added to 1/E2. Other circuit numbers have been reassigned on 1/E2. • Circuiting for water cooler and instantaneous water heaters has been added to 1/E3. Other circuit numbers have been reassigned on 1/E3. • Low Voltage Lighting Control Schedule has been modified on sheet E5. • Lighting circuit numbers have been changed on 1/E6. • One-Line Diagram on sheet E7 has been modified. Panel Schedule “L3” has been replaced with Panel Schedule “L2” on sheet E7. • The fault current study and Typical Grounding Detail have been deleted from sheet E7.