• Minor adjustments to the location and dimensions of the 2nd floor restrooms • Relocation of some of the 2nd floor static displays • Modifications to the water and sanitary lines between 1st and 2nd floors • Relocated the return ducts above the 2nd floor • All new data outlets have been removed from the plans • Modifications to the floor boxes and receptacles • The electrical plans have been updated to accommodate the location changes for the water cooler, the mop sink water heater, and the floor plan changes in the restrooms • Panel schedules have been updated to reflect small load changes • Clarification to the header detail on the south-facing storefront on the ground floor. • Additional details concerning the structural framing of storefronts on separate sheet