• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-23-0502048
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Pending
Description

THRESHOLD *PRIVATE PROVIDER – INSPECTIONS ONLY* Phase 1: Site and Foundation for MetWest Residential, an eight-story CMU and concrete multifamily apartment building with a restaurant shell space, and a 628 space cast-in-place parking garage. Amenities include a pool courtyard on the top of the parking garage, an aqua lounge overlooking the pool, a sunset deck with social club on the 8th floor, fitness, and dedicated co-working space.

Owner
Metwest International Owner Llc
Address
4160 W BOY SCOUT BLVD, TAMPA, FL 33607
Zoning
REGIONAL MIXED USE-100 (3.5 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Metwest International Multifamily Owner Llc
Parcel
1120210674
Value
$3,125,709.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
1003
Zoning Acres:
147427.2752
FIRM Panel:
1201140022C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004600
Population:
385

Preparing the map…

4160 W BOY SCOUT BLVD, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-07-12
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-07-12
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2023-07-17
Building - 5 Applied, 1 Complied - Building Permit - Private Provider and Special Inspector
Threshold building with a Private Provider or Special Inspector assigned
Informational • 2024-02-13
NSF Fee Due
NSF Fee due - Original amount due on (bld-24-0504183-9) $522.75+ NSF Fee due $40 = Total amount due $562.75 Only charging the fee on one record as one time courtesy
Informational • 2024-09-17

Related Records9

BLD-23-0502048
Pending
BLD-24-0509593
Issued
BLDLP-24-007298
Complete
BLDCO-23-000769
Complete
BLD-24-0511617
In Process
BLD-24-0510490
Issued
BLDCO-25-001705
Complete
BLDLP-24-008109
Complete
BLD-25-0513380
Issued
BLD-24-0504183
Pending

Frequently Asked Questions

Related Links

Related Permits

  • BLD-24-0509593 (related)
  • BLDLP-24-007298 (related)
  • BLDCO-23-000769 (related)
  • BLD-24-0511617 (related)
  • BLD-24-0510490 (related)
  • BLDCO-25-001705 (related)
  • BLDLP-24-008109 (related)
  • BLD-25-0513380 (related)
  • BLD-24-0504183 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-07-12
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-07-12
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2023-07-17
Building - 5 Applied, 1 Complied - Building Permit - Private Provider and Special Inspector
Threshold building with a Private Provider or Special Inspector assigned
Informational • 2024-02-13
NSF Fee Due
NSF Fee due - Original amount due on (bld-24-0504183-9) $522.75+ NSF Fee due $40 = Total amount due $562.75 Only charging the fee on one record as one time courtesy
Informational • 2024-09-17

Related Records9

BLD-23-0502048
Pending
BLD-24-0509593
Issued
BLDLP-24-007298
Complete
BLDCO-23-000769
Complete
BLD-24-0511617
In Process
BLD-24-0510490
Issued
BLDCO-25-001705
Complete
BLDLP-24-008109
Complete
BLD-25-0513380
Issued
BLD-24-0504183
Pending
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →