Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2023-09-25
Building - 1 Applied, 2 Released, 1 Complied - Building Permit - C/O Hold for Private Drainage Easement
Prior to C/O a private drainage easement must be obtained for the shared use of the stormwater drainage pipe in the northeast corner of the lot being shared with the adjacent parcel owner
Informational • 2023-11-28
School concurrency certificate
School Concurrency approval required prior to approval of the Phase 2 vertical permit. Contact Renee Kamen (Renee.Kamen@hcps.net) or Glorimar.Belangia (Glorimar.Belangia@hcps.net) for approval status
Informational • 2023-12-12
Mechanical Permit Revision
Mechanical Permit Revision required prior to vertical construction
Informational • 2025-06-18