Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-10-04
Building - 2 Applied, 7 Released, 4 Complied - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2024-04-23
Energy and HVAC Heating and Cooling Load calculations
Energy and HVAC Heating and Cooling Load calculations shall be coordinated with plans including all unit references, tonnage, schedules, etc. Refer to page 7 of energy calculation. Mechanical Permit Revision required prior to vertical construction. See condition on the record
Informational • 2025-06-03
Steel Stair Manufacturer Shop Drawings
An approved revision is required to be submitted prior to the placement of the stairs. Per client Manufactures steel staircase is a deferred submittal and will be submitted by GC when shop drawings are produced
Informational • 2025-06-03
Mechanical Permit Revision
Mechanical Permit Revision required prior to vertical construction
Informational • 2025-06-18