• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0504267
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Pending
Description

Construct New Custom SFR New 2 story SFR with - 4 rooms, 5 baths, 2 car garage, 2 screened lanai and front porch

Job Value

$750,000.00

Owner
Troy W Jr And Ann G Newsome
Address
4504 W BROOKWOOD DR, TAMPA, FL 33629
Zoning
RESIDENTIAL-6
Risk
AESFHABFE 9 ft
Advanced details
Owner
Troy W Jr And Ann G Newsome
Parcel
1206980000
Value
$468,131.00
Year Built
2025
Stories:
2
Units:
0
Buildings:
1
Land Use Code:
0000
Zoning Acres:
147427.2752
FIRM Panel:
1201140031C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
005900
Population:
219

Preparing the map…

4504 W BROOKWOOD DR, TAMPA, FL 33629

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2023-10-13
Building - 1 Applied, 3 Complied - Building Permit - Flood Certificate Required
Flood Certificate Required
Informational • 2023-11-13
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-07-30
Termite Cert
Termite Certification Required
Informational • 2025-08-01

Related Records10

BLD-24-0504267
Pending
BLDLP-24-003060
Complete
BLDLP-24-003760
Complete
UTL-24-0000075
Closed
BLDLP-24-006755
Complete
BLDLP-24-003592
Complete
BLDLP-24-003608
Complete
BLD-24-0504270
Complete
BDE-23-0443192
Complete
BLDLP-24-006944
Complete
BLDLP-24-004085
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-003060 (related)
  • BLDLP-24-003760 (related)
  • UTL-24-0000075 (related)
  • BLDLP-24-006755 (related)
  • BLDLP-24-003592 (related)
  • BLDLP-24-003608 (related)
  • BLD-24-0504270 (related)
  • BDE-23-0443192 (related)
  • BLDLP-24-006944 (related)
  • BLDLP-24-004085 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2023-10-13
Building - 1 Applied, 3 Complied - Building Permit - Flood Certificate Required
Flood Certificate Required
Informational • 2023-11-13
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-07-30
Termite Cert
Termite Certification Required
Informational • 2025-08-01

Related Records10

BLD-24-0504267
Pending
BLDLP-24-003060
Complete
BLDLP-24-003760
Complete
UTL-24-0000075
Closed
BLDLP-24-006755
Complete
BLDLP-24-003592
Complete
BLDLP-24-003608
Complete
BLD-24-0504270
Complete
BDE-23-0443192
Complete
BLDLP-24-006944
Complete
BLDLP-24-004085
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →