• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0504270
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Complete
Description

Early Start issued for interior non-structural work ONLY up to the point of first inspection. No structural work may be done under the authority of the Early Start, and no inspections may be scheduled until the permit is issued. Interior Renovation of Suite 780. Including architectural, mechanical, electrical and fire protection. No Plumbing or F/A

Job Value

$85,000.00

Owner
Highwoods Realty Limited Partnership
Address
4200 W CYPRESS ST, TAMPA, FL 33607
Zoning
REGIONAL MIXED USE-100 (3.5 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Highwoods Realty Limited Partnership
Parcel
1149990010
Value
$36,252,400.00
Year Built
1989
Stories:
16
Units:
0
Buildings:
2
Land Use Code:
1810
Zoning Acres:
147427.2752
FIRM Panel:
1201140022C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004600
Population:
0

Preparing the map…

4200 W CYPRESS ST, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-10-13
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-11-03
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-11-03
Water Commitment Required
Due to minimal plumbing changes, the existing 3-inch domestic meter (serial no. 21100529) is adequate. A Water Commitment is not needed for this project. The backflow device is compliant
Informational • 2023-11-03
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-11-03

Related Records10

BLD-24-0504270
Complete
BLDLP-24-003060
Complete
BLDLP-24-003760
Complete
UTL-24-0000075
Closed
BLDLP-24-006755
Complete
BLDLP-24-003592
Complete
BLDLP-24-003608
Complete
BDE-23-0443192
Complete
BLD-24-0504267
Pending
BLDLP-24-006944
Complete
BLDLP-24-004085
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-003060 (related)
  • BLDLP-24-003760 (related)
  • UTL-24-0000075 (related)
  • BLDLP-24-006755 (related)
  • BLDLP-24-003592 (related)
  • BLDLP-24-003608 (related)
  • BDE-23-0443192 (related)
  • BLD-24-0504267 (related)
  • BLDLP-24-006944 (related)
  • BLDLP-24-004085 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-10-13
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-11-03
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-11-03
Water Commitment Required
Due to minimal plumbing changes, the existing 3-inch domestic meter (serial no. 21100529) is adequate. A Water Commitment is not needed for this project. The backflow device is compliant
Informational • 2023-11-03
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-11-03

Related Records10

BLD-24-0504270
Complete
BLDLP-24-003060
Complete
BLDLP-24-003760
Complete
UTL-24-0000075
Closed
BLDLP-24-006755
Complete
BLDLP-24-003592
Complete
BLDLP-24-003608
Complete
BDE-23-0443192
Complete
BLD-24-0504267
Pending
BLDLP-24-006944
Complete
BLDLP-24-004085
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →