Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-10-13
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-10-13
Demolition Placard Required
A demolition placard is required on this record
Informational • 2023-10-24
Mandatory TAC Meeting
A Mandatory Technical Advisory Consultation (TAC Meeting) is required after plan review corrections have been made to the maximum extant feasible. Contact John.Franklin@tampagov.net to schedule the required TAC Meeting
Informational • 2024-01-05
Building - 4 Applied, 1 Complied, 1 Not Applicable - Building Permit - SIGNED AND SEALED SHORING PLANS AS WELL AS SHORING INSPECTION REPORT MUST BE SUBMITTED AS A FORMAL REVISION BEFORE CONCRETE POUR
—
Informational • 2024-05-28