• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0506908
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Pending
Description

Suite 150 - Commercial interior remodel of existing office space 150

Job Value

$25,000.00

Owner
Tdc Concourse Llc Etal
Address
3507 E FRONTAGE RD, TAMPA, FL 33607
Zoning
MUNICIPAL AIRPORT COMPATIBILITY
Risk
AESFHABFE 9 ft
Advanced details
Owner
Tdc Concourse Llc Etal
Parcel
1124540000
Value
$11,451,900.00
Year Built
1984
Stories:
3
Units:
0
Buildings:
1
Land Use Code:
1820
Zoning Acres:
147427.2752
FIRM Panel:
1201140021C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
004600
Population:
0

Preparing the map…

3507 E FRONTAGE RD, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURE PLANS
Government Owned/Occupied - Attorney General
Informational • 2016-05-13
Building - 3 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-02-15
Utilities - Certificate of Occupancy Hold for Water - Cross Connection Inspection (Backflow)
The Water Department has determined that the existing 1.5” water meter (Ser. NO. 31688526) is adequate for the proposed interior renovation with no change in use. We have no record of a backflow at this location (3507 E Frontage Rd). A hold will remain on the C/O until a backflow prevention assembly (RPZ) is installed, inspected, and tested. As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. A reduced-pressure principal assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City’s Cross Connection Control and Prevention Manual. The City will own and maintain the D.D.C.V.A. on the fire line while all other backflow prevention devices will be the responsibility of the property owner. You will be required to have all private assembly(ies) tested every year. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. You agree to pay for and install an approved detector meter on the fire service backflow prevention device and provide detector meter readings to the City at a frequency determined by the City and when requested. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2024-02-16
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2024-02-16
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2024-02-16

Related Records7

BLD-24-0506908
Pending
BLDLP-24-005523
Complete
BLDLP-23-009177
Complete
BLD-23-0501959-REV2
Complete
BLD-23-0501959
Complete
BLDLP-24-003834
Complete
UTL-24-0000761
Complete
BLDCO-24-001280
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-005523 (related)
  • BLDLP-23-009177 (related)
  • BLD-23-0501959-REV2 (related)
  • BLD-23-0501959 (related)
  • BLDLP-24-003834 (related)
  • UTL-24-0000761 (related)
  • BLDCO-24-001280 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURE PLANS
Government Owned/Occupied - Attorney General
Informational • 2016-05-13
Building - 3 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-02-15
Utilities - Certificate of Occupancy Hold for Water - Cross Connection Inspection (Backflow)
The Water Department has determined that the existing 1.5” water meter (Ser. NO. 31688526) is adequate for the proposed interior renovation with no change in use. We have no record of a backflow at this location (3507 E Frontage Rd). A hold will remain on the C/O until a backflow prevention assembly (RPZ) is installed, inspected, and tested. As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. A reduced-pressure principal assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City’s Cross Connection Control and Prevention Manual. The City will own and maintain the D.D.C.V.A. on the fire line while all other backflow prevention devices will be the responsibility of the property owner. You will be required to have all private assembly(ies) tested every year. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. You agree to pay for and install an approved detector meter on the fire service backflow prevention device and provide detector meter readings to the City at a frequency determined by the City and when requested. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2024-02-16
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2024-02-16
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2024-02-16

Related Records7

BLD-24-0506908
Pending
BLDLP-24-005523
Complete
BLDLP-23-009177
Complete
BLD-23-0501959-REV2
Complete
BLD-23-0501959
Complete
BLDLP-24-003834
Complete
UTL-24-0000761
Complete
BLDCO-24-001280
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →