CIVIL revisions: 1) Revised 1" HDPE on-site to 2" HDPE over to restroom structure. 2) Added (2 ea) hose bib locations, (1 ea) at the dumpster & (1 ea) at the lift station. 3) Added (2 ea) 2"x1" T's and 85 LF of 1" HDPE to each hose bib location.
Preparing the map…
6912 INTERBAY BLVD, TAMPA, FL 33616