• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0510460
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Pending
Description

New construction of SFR 3 stories and a roof top

Job Value

$550,000.00

Owner
502 Columbia Llc
Address
502 COLUMBIA DR, TAMPA, FL 33606
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
AESFHABFE 10 ft
Advanced details
Owner
502 Columbia Llc
Parcel
1959450000
Value
$656,208.00
Year Built
1972
Stories:
1
Units:
1
Buildings:
1
Land Use Code:
0100
Zoning Acres:
147427.2752
FIRM Panel:
1201140033C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
005401
Population:
40

Preparing the map…

502 COLUMBIA DR, TAMPA, FL 33606

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 6 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-07-24
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-07-24
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-07-24
Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2024-08-16
Termite Cert
Termite Certification Required
Informational • 2024-08-16

Related Records6

BLD-24-0510460
Pending
BLDCO-24-001587
Complete
BLD-24-0510470
Complete
BLDCO-24-001480
Complete
BLDLP-24-009934
Complete
BLDLP-24-010044
Complete
BLDLP-24-010062
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDCO-24-001587 (related)
  • BLD-24-0510470 (related)
  • BLDCO-24-001480 (related)
  • BLDLP-24-009934 (related)
  • BLDLP-24-010044 (related)
  • BLDLP-24-010062 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 6 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-07-24
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-07-24
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-07-24
Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2024-08-16
Termite Cert
Termite Certification Required
Informational • 2024-08-16

Related Records6

BLD-24-0510460
Pending
BLDCO-24-001587
Complete
BLD-24-0510470
Complete
BLDCO-24-001480
Complete
BLDLP-24-009934
Complete
BLDLP-24-010044
Complete
BLDLP-24-010062
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →