• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberUTL-24-0001787
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Pending
Description

New irrigation meter to serve MF Residential development

Owner
Maa Westshore Exchange Llc
Address
5432 W TYSON AVE 100-130, TAMPA, FL 33611
Zoning
COMMUNITY MIXED USE-35 (2.0 FAR)
Risk
AESFHABFE 9 ft
Advanced details
Owner
Se Tampa Bay Llc
Parcel
1311830010
Value
$21,143,819.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
4000
Zoning Acres:
147427.2752
FIRM Panel:
1201140036C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
007102
Population:
173

Preparing the map…

5432 W TYSON AVE 100-130, TAMPA, FL 33611

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Transportation Mitigation due
Per the approved rezoning PD site plan REZ-20-92, prior to the issuance of the first building permit, a mitigation payment of $308,076 shall be paid to the Transportation Division for improvements in the Interbay District area. Within 2 years of the final certificate of occupancy for the project, the developer will complete a signal warrant analysis and provide a written report for the intersection of W Tyson Ave and S West Shore Blvd. If a signal is warranted, the developer will pay its proportionate fair share to design and construct a new traffic signal
Informational • 2022-10-10
Building - 2 Applied, 2 Complied - Building Permit - Engineering Report required
Final Engineering Report will be required for the commissioning of the underground stormwater drainage system, as well as the approval of the system installation (work concealed without COT inspection)
Informational • 2023-07-24
Engineering Report required
Final Engineering Report will be required for the commissioning of the underground stormwater drainage system, as well as the approval of the system installation (work concealed without COT inspection)
Informational • 2023-07-24

Related Records1

UTL-24-0001787
Pending
BLD-22-0490322-REV2
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-22-0490322-REV2 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Transportation Mitigation due
Per the approved rezoning PD site plan REZ-20-92, prior to the issuance of the first building permit, a mitigation payment of $308,076 shall be paid to the Transportation Division for improvements in the Interbay District area. Within 2 years of the final certificate of occupancy for the project, the developer will complete a signal warrant analysis and provide a written report for the intersection of W Tyson Ave and S West Shore Blvd. If a signal is warranted, the developer will pay its proportionate fair share to design and construct a new traffic signal
Informational • 2022-10-10
Building - 2 Applied, 2 Complied - Building Permit - Engineering Report required
Final Engineering Report will be required for the commissioning of the underground stormwater drainage system, as well as the approval of the system installation (work concealed without COT inspection)
Informational • 2023-07-24
Engineering Report required
Final Engineering Report will be required for the commissioning of the underground stormwater drainage system, as well as the approval of the system installation (work concealed without COT inspection)
Informational • 2023-07-24

Related Records1

UTL-24-0001787
Pending
BLD-22-0490322-REV2
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →