Planning - 2 Complied, 1 Released - Stormwater - Stormwater Hold
Existing Drainage Easement ORB 5554 Pg. 1718 to be released prior to first building permit. Please contact Charlie Rodriguez (813)274-3135 for any questions
Informational • 2022-06-22
Transportation Mitigation due
Per the approved rezoning PD site plan REZ-20-92, prior to the issuance of the first building permit, a mitigation payment of $308,076 shall be paid to the Transportation Division for improvements in the Interbay District area. Within 2 years of the final certificate of occupancy for the project, the developer will complete a signal warrant analysis and provide a written report for the intersection of W Tyson Ave and S West Shore Blvd. If a signal is warranted, the developer will pay its proportionate fair share to design and construct a new traffic signal
Informational • 2022-10-10
Building - 1 Applied, 2 Complied - Building Permit - Engineering Report required
Final Engineering Report will be required for the commissioning of the underground stormwater drainage system, as well as the approval of the system installation (work concealed without COT inspection)
Informational • 2023-07-24
Transportation - CO HOLD: Signal payment due
signal payment of $245,343 per email 1/18/2024 and uploaded on 2/9/2024 in BLD-22-0490322. Please contact Jonathan Scott 274-8361 or Melanie Calloway 274-8526
Informational • 2024-03-18
NSF Fee Due
NSF - Refer to maker NSF Fee due - (Refer to maker) Original amount due on (BLD-25-0513516) $45,650.36 + NSF Fee due $2,282.52 = Total amount due $47,932.88
Informational • 2025-05-12