• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-22-0490322-REV3
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Complete
Description

Relocating the FDC in front of Marina Bldg. Extended the 10 ft. sidewalk located at the NW corner of the site to the north property line, as well as extended the 10 ft. sidewalk located at the SE corner of the site toward the east property line. Modified the location of the 4 ft. high opaque fence to the back of sidewalk located at the SE corner of the site.

Owner
Maa Westshore Exchange Llc
Address
5440 W TYSON AVE, TAMPA, FL 33611
Zoning
COMMUNITY MIXED USE-35 (2.0 FAR)
Risk
VESFHABFE 9 ft
Advanced details
Owner
Maa Westshore Exchange Llc
Parcel
1311910000
Value
$18,098,482.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
1003
Zoning Acres:
147427.2752
FIRM Panel:
1201140036C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
007102
Population:
173

Preparing the map…

5440 W TYSON AVE, TAMPA, FL 33611

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Planning - 2 Complied, 1 Released - Stormwater - Stormwater Hold
Existing Drainage Easement ORB 5554 Pg. 1718 to be released prior to first building permit. Please contact Charlie Rodriguez (813)274-3135 for any questions
Informational • 2022-06-22
Transportation Mitigation due
Per the approved rezoning PD site plan REZ-20-92, prior to the issuance of the first building permit, a mitigation payment of $308,076 shall be paid to the Transportation Division for improvements in the Interbay District area. Within 2 years of the final certificate of occupancy for the project, the developer will complete a signal warrant analysis and provide a written report for the intersection of W Tyson Ave and S West Shore Blvd. If a signal is warranted, the developer will pay its proportionate fair share to design and construct a new traffic signal
Informational • 2022-10-10
Building - 1 Applied, 2 Complied - Building Permit - Engineering Report required
Final Engineering Report will be required for the commissioning of the underground stormwater drainage system, as well as the approval of the system installation (work concealed without COT inspection)
Informational • 2023-07-24
Transportation - CO HOLD: Signal payment due
signal payment of $245,343 per email 1/18/2024 and uploaded on 2/9/2024 in BLD-22-0490322. Please contact Jonathan Scott 274-8361 or Melanie Calloway 274-8526
Informational • 2024-03-18
NSF Fee Due
NSF - Refer to maker NSF Fee due - (Refer to maker) Original amount due on (BLD-25-0513516) $45,650.36 + NSF Fee due $2,282.52 = Total amount due $47,932.88
Informational • 2025-05-12

Related Records16

BLD-22-0490322-REV3
Complete
BLDLP-24-004025
Complete
BLDCO-25-001773
Complete
BLD-23-0501469
Pending
BLD-23-0500799
Pending
UTL-24-0000396
In Progress
BLD-24-0509518
Complete
BLD-22-0490322-REV1
Complete
BLDLP-24-005194
Complete
BLDCO-25-001809
Complete
BLD-22-0490322-REV2
Complete
BLDCO-24-000642
Complete
SPR-25-0001433
Site Plan Review Complete
BLD-24-0507967
Expired
BLD-23-0501469-REV1
Complete
BLD-24-0507141
Pending
BLDCO-25-000178
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-004025 (related)
  • BLDCO-25-001773 (related)
  • BLD-23-0501469 (related)
  • BLD-23-0500799 (related)
  • UTL-24-0000396 (related)
  • BLD-24-0509518 (related)
  • BLD-22-0490322-REV1 (related)
  • BLDLP-24-005194 (related)
  • BLDCO-25-001809 (related)
  • BLD-22-0490322-REV2 (related)
  • BLDCO-24-000642 (related)
  • SPR-25-0001433 (related)
  • BLD-24-0507967 (related)
  • BLD-23-0501469-REV1 (related)
  • BLD-24-0507141 (related)
  • BLDCO-25-000178 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Planning - 2 Complied, 1 Released - Stormwater - Stormwater Hold
Existing Drainage Easement ORB 5554 Pg. 1718 to be released prior to first building permit. Please contact Charlie Rodriguez (813)274-3135 for any questions
Informational • 2022-06-22
Transportation Mitigation due
Per the approved rezoning PD site plan REZ-20-92, prior to the issuance of the first building permit, a mitigation payment of $308,076 shall be paid to the Transportation Division for improvements in the Interbay District area. Within 2 years of the final certificate of occupancy for the project, the developer will complete a signal warrant analysis and provide a written report for the intersection of W Tyson Ave and S West Shore Blvd. If a signal is warranted, the developer will pay its proportionate fair share to design and construct a new traffic signal
Informational • 2022-10-10
Building - 1 Applied, 2 Complied - Building Permit - Engineering Report required
Final Engineering Report will be required for the commissioning of the underground stormwater drainage system, as well as the approval of the system installation (work concealed without COT inspection)
Informational • 2023-07-24
Transportation - CO HOLD: Signal payment due
signal payment of $245,343 per email 1/18/2024 and uploaded on 2/9/2024 in BLD-22-0490322. Please contact Jonathan Scott 274-8361 or Melanie Calloway 274-8526
Informational • 2024-03-18
NSF Fee Due
NSF - Refer to maker NSF Fee due - (Refer to maker) Original amount due on (BLD-25-0513516) $45,650.36 + NSF Fee due $2,282.52 = Total amount due $47,932.88
Informational • 2025-05-12

Related Records16

BLD-22-0490322-REV3
Complete
BLDLP-24-004025
Complete
BLDCO-25-001773
Complete
BLD-23-0501469
Pending
BLD-23-0500799
Pending
UTL-24-0000396
In Progress
BLD-24-0509518
Complete
BLD-22-0490322-REV1
Complete
BLDLP-24-005194
Complete
BLDCO-25-001809
Complete
BLD-22-0490322-REV2
Complete
BLDCO-24-000642
Complete
SPR-25-0001433
Site Plan Review Complete
BLD-24-0507967
Expired
BLD-23-0501469-REV1
Complete
BLD-24-0507141
Pending
BLDCO-25-000178
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →