Dewatering system only, for Enabling construction phase of new Airside D at TPA Airport. Dewatering system will discharge to existing sanitary sewer lines just South of site. Dewatering capacity will be capped at 158 gpm based on prior discussions with City of Tampa. System is designed to run 24/7 with a capacity of 200,000 gpd.