This plan revision encompasses multiple changes of scope including changes in Civil, Architectural, Life Safety, Mechanical, Electrical, Plumbing, and Fire Protection. The revisions include the relocation of RTus, added lift station and shower, parking lot layout, exterior/interior elevations, RCPs, door schedule, and transformer relocation.