• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-23-0500302
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 8, 2025
Status
Complete
Description

*PRIVATE PROVIDER - PLAN REVIEW AND INSPECTIONS* NEW 7 UNIT TH - LOTS 1, 2, 3, 4, 5, 6 & 7 PLAN REVIEW SERVICES BY VIRTUAL ASSIST, INC INSPECTION SERVICES BY AQUILA INSPECTION SERVICES LLC BLD-22-0491882 - SITE/INFRASTRUCTURE/FOUNDATION UTL-22-0000932 - UTILITY

Owner
Op Spe Phx1 Llc
Address
3422 W LA SALLE ST 1-7, TAMPA, 33607 VIEW ADDITIONAL LOCATIONS>>1)3421 W ARCH ST 1-3, T, 33607 2)1315 N HIMES AVE, TAMPA, FL 33607
Zoning
COMMUNITY COMMERCIAL-35 (2.0 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Op Monterey Llc
Parcel
1109200048
Value
$238,852.00
Year Built
2024
Stories:
3
Units:
1
Buildings:
0
Land Use Code:
0106
Zoning Acres:
147427.2752
FIRM Panel:
1201140022C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004800
Population:
25

Preparing the map…

3422 W LA SALLE ST 1-7, TAMPA, 33607 VIEW ADDITIONAL LOCATIONS>>1)3421 W ARCH ST 1-3, T, 33607 2)1315 N HIMES AVE, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 6 Complied, 2 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-04-18
Utilities - Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2024-03-25
Private Provider Final Inspection Report Required
Private Provider Final Inspection Report Required
Informational • 2024-09-06
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-01-03
Termite Cert
Termite Certification Required
Informational • 2025-01-03

Related Records6

BLD-23-0500302
Complete
BLD-22-0491882-REV8
Complete
BLD-23-0500302-REV1
Complete
BLD-23-0500302-REV2
Complete
BLD-23-0500131
Complete
BLD-22-0491882-REV6
Complete
BLDLP-23-008290
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-22-0491882-REV8 (related)
  • BLD-23-0500302-REV1 (related)
  • BLD-23-0500302-REV2 (related)
  • BLD-23-0500131 (related)
  • BLD-22-0491882-REV6 (related)
  • BLDLP-23-008290 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 6 Complied, 2 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-04-18
Utilities - Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2024-03-25
Private Provider Final Inspection Report Required
Private Provider Final Inspection Report Required
Informational • 2024-09-06
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-01-03
Termite Cert
Termite Certification Required
Informational • 2025-01-03

Related Records6

BLD-23-0500302
Complete
BLD-22-0491882-REV8
Complete
BLD-23-0500302-REV1
Complete
BLD-23-0500302-REV2
Complete
BLD-23-0500131
Complete
BLD-22-0491882-REV6
Complete
BLDLP-23-008290
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →