Razed/Cleared
Building Condition Code: 07
Informational • 2015-01-11
Building - 5 Applied, 3 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-07-09
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-07-09
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-07-09
Sprinkler system
Report and approval from the Fire Marshal prior to CO, verifying that the sprinkler system will meet the required pressure through connection to the City water system
Informational • 2025-04-21